This plant processes
20.000 biodiesel lts/day considering a weekly stop for maintenance and
services.
The Plants are composed for:
-
Design of plant. Model DI 20
-
1 Process Unit, Model: M 11000 that produces
1000 biodiesel lts/hour.
-
Methoxid Pre-mixture Unit, Model: UAM 20 , with
production capacity superior to to 4.000 lts per day.
-
Unit of recovery of methanol of the glycerol, Model:
MR 20 , it recovers 950 methanol lts approximately and it processes 2.000
glycerol lts per day.
-
Unit of methanol concentration. Model RC 20 it
distills 4.000 methanol lts per day.
-
Center of control Model DC 20. Table and 2 screens
keyboard and mouse of PC, rack with CPU´s and server, for plant control,
control program and communications, programm of extraction of statistical
of production, consumptions times of stop, etc.
-
Setting in march, hand-key. Model PM 20
More
information...
DI´s
(Plant
Design)
Based on the
physical planes of the place where it will implement the plant our
professionals are carried out the design of pipes and disposition of the
equipment.
UP..
Process Units
It is formed by
one fully automatic unit, Model: M11000 ( to process 1000 lts/h)
That contain
the following elements:
-
Reactor
, external thermal covering.
-
Pipes in
steel.
-
Mechanical
agitator.
-
Valve of
relief, valve of security.
-
Magnetic
level Sensors.
-
Heaters.
-
Electronic
sensor of temperature.
-
Sensor of
pressure.
-
Recirculation
and exchange pump .
-
Methoxid
Dose.
-
Electronic
optic level sensors.
-
3
Decants made in steel.
-
Pipe in PPP .
-
Reflux
methanol condenser.
-
Exchange
pump.
-
Electronic
optic level sensors.
-
Laundry
tank, made in steel.
-
Valve of
relief, valve of security.
-
Water dose.
-
Acid dose.
-
Electronic
optic level sensors.
-
Recirculation
pump.
-
Dry tank, made in steel reforced.
-
Valve of
relief, valve of security.
-
Electronic
optic level sensors.
-
Recirculation
pump.
-
Vacuum pump.
-
Vacuum
electronic control
-
Heaters
-
Electronic
temperature sense.
-
Electronic
circuit of
control.
-
CPU and
support microcontrollers.
-
48 relay
output.
-
20 analogical
inputs.
-
4 digital
inputs.
-
Battery of
back up.
-
1 Display.
-
1 Remote infra
red control.
-
Communication
Port 485
-
Communication
RS 232
UP..
UAM´s
(Pre-mixture
of methoxid of sodium Unit )
This units
prepares the methoxid in automatic form, diminishing the risk for the
handler of dangerous substances and assuring the constant quality and matter
dose prevails.
-
Internal
basket for load the NaOH
-
Revolving
valve of dosage.
-
Recirculation
pump.
-
Level
sensors.
-
Cold finger.
-
Tank of
methoxid reception with daily capacity.
UP..
MR´s
(Methanol
recovery from the glycerol Unit
)
this unit
allows to extract the residual alcohol that is caught in the glycerol.
Together with the condenser, incorporate into the main processor, they
almost recover 50% of the alcohol used in the process of elaboration of
Biodiesel.
-
4
Interchanges of heat of helmets and tubes.
-
3 Recipients
of separation liquid-gas.
-
1 hole pump.
-
1
liquid-liquid separation recipient.
-
3 Pumps of
liquid.
UP..
RC´s
( Methanol
Concentration Unit )
This Unit
processes the methanol to extract the water that impedes the
Transesterification process in the reactor.
The
unit
consist in:
-
Column of
distillation.
-
Condenser .
-
Internal
Boiler.
UP..
CC´s
(Control
center.
)
It is the
neurological center of the plant of biodiesel process.
Through these
screens and their PC´s and they control it is administered all the matters
cousins, their doses, and quantities. The times, temperatures and pressures
of all the units are programmed linked to the system.
The alarms are
received by damages, matter lack prevails, etc in anyone of the external
tanks, or in the process units.
They are also
extracted statistical of production, consumptions for periods, etc.
-
Rack
including 3 CPU of control for plants and external tanks.
-
PC, PENTIUM 4
2.8GHZ 512 MB HD 80G MON. 17"
-
Server for
intranet communications.
-
Software of
Control and statistical.
UP..
PM´s
(Setting
up and training.
)
Personel
of our company will travel for the setting up of the plant and the
personnel's training that will be to position.
More
information... |